Safe lifting hoist procedures

One,  Hoist equipment  should be checked before the mechanical part, wire rope, hook, stopper, etc. should be in good condition, check the electrical part should be no leakage, grounding device should be good. Each lifting weights, lifting off the ground at 10cm should stop and check the brake situation, to work only after confirmation well. Open operation should be set up anti-canopy.
Second, the allowed overload lifting, lifting hands are not allowed to hold the rope and between objects hanging objects increases, to prevent collision.
Third,  lift hoist  lifting occurs during the odor, heat should immediately stop checks, identify the causes, treatment may continue working.
Four, tied securely to lifting objects, and in the center of gravity. Hoists walking, weight is not too high from the ground, from man's head crossed prohibited weights, working gap not place heavy objects hanging in the air.
Fifth, in the lifting, due to failure caused by heavy decline, it must take urgent measures to no weight at decentralization.
Six, using the hanging cable electrical switch start, insulation must be good, must slide freely and correctly push-button operation and attention of people standing position.
Seven,  Wire rope hoist  wire rope on the drum to be wound neatly placed in the lowest position when the hook, wire rope on the drum should not be less than three times.
Eight, vertical lifting heavy lifting must be done, and not stayed heavy, lifting the weight is not hanging unclear.
Nine, after the work is completed,  hoist equipment  should stop at the specified location, hook rises, and cut off the power.