Article: should be installed in a variety of cranes, indicating signs of mechanical properties and, if necessary install winch limiter, load controllers, interlock switches and other devices, rail-mounted crane shall be placed walking and rail clamp stopper ,hoist equipment try hanging should be checked before use.
Article II: wire rope on the drum must be arranged in neat rows, tail cards firmly keep working at least three times or more.
Article: Do not arbitrarily change the crane's performance.
Article IV: operations personnel to obey the command signal, the signal is unknown or is likely to cause an accident should be suspended operations.
Article V: lifting, lifting objects shall not someone to stay and walk.
Article VI: lifting objects should pull the rope slipped, the speed should be uniform, stable and prevention of sudden braking and changes of direction, lifting objects, should be more than 0.5 meters above the barrier, falling should be low light, to prevent dumping.
Article VII: When lifting objects is prohibited to stand on the object.
Article VIII: establish sound crane maintenance,manual hoist periodic inspection, safe operating system, and education-related personnel to seriously implemented.
Article IX: bridge crane shall be provided chauffeur-driven, a person responsible hooks and directing (the need for operating permits). Driving without a license is strictly prohibited and conductor.
Article: crane workplace have sufficient lighting and smooth lifting channels. Prohibited from hanging objects across the top of the head.
Article 11:wire rope winch The crane was part of maximum weight indicated is prohibited overload.
Article 12: The crane work, the prohibition down personnel are not allowed to engage in maintenance work, banned from a crane over to another crane up. In addition to parking maintenance is prohibited to leave the track