Hand monorail car installation instructions

1 crane installation,hoist and trolley should make the rings to adjust the gasket around the inside wall equal to the number. But to ensure that side of the track and the roller gap is required between the edge of the rings on both sides to allow adjustment of a difference in the number washer.
2 lane installed in the track, the preload nut shaft hanging, hang light load test run, to be on the wheel and rail, and then tighten the outer nut, special attention should be interlocked between the nut.
3 TROLLEYS walking to be adjusted after installation kits and track ground roll gap to reach the specified value.manual hoist Adjustment method is: first loosen the nut, sleeve shaft to move the roll gap reaches a predetermined value, and then tighten the nut.
Precautions
Driving is strictly prohibited to use than the rated load.
Driving in lifting weights, and forbids anyone to walk or work under heavy loads.
TROLLEYS who encounter when using hand chain pull them or hand pull exception, must not yank, should immediately stop using and check whether the lifting of heavy objects with other objects implicated or have other faults.
TROLLEYS when in use,rope hoist do not differ with bracelet wheel plane at oblique plane pulling hand chain, side zipper hand beating or snap ring.
Bearings, gears, and track surface should be regularly filling grease.