In the cement and other building materials enterprises

In the cement and other building materials enterprises, has been widely applied electric hoist. Grinding machine parts electric hoist sliding failure occurs frequently, to inconvenience inspection work. Now XianRong a simple and practical design of electric hoist line installation method. Electric hoist is installed in the cement and other building manual hoist enterprises, has been widely applied electric hoist. Grinding machine parts electric hoist sliding failure occurs frequently, to inconvenience inspection work. Now XianRong a simple and practical design of electric hoist slip line installation method.
1. Electric hoist is installed on the u-shaped track. In view of this characteristic, we put the wire in the middle of the track, upper joist. Wire rope using vertebral 10 mm or round hoist equipment wire rope, end with a flower basket bolts.
2. The slip ring for two ring clasp, have certain allowance, in order to avoid wire scratch CARDS. To ring for two rings bolts connected, free to roll.
3. Turned to a ring set on the wire at one end and leave a good motor lead rubber sleeve after fixed in turn ring bottom line. Then put multiple slide rings to wear on the wire at one end, and the rubber sleeve fixed in the slip ring bottom line segments. Front end to motor, are free to roll. After the termination on the power supply.
4. Under the traction of the motor to turn to ring for the central, traction rope make linear or circular motion. 5. Keep track of the above methods may be adopted.