2014年6月26日星期四

Brief introduction of winch

strong electric winch (also called winch) is composed of a human or mechanical power driven drum,winding traction rope to complete the installation work. Can be vertical, horizontal or inclined dragging. The windlass is divided into manual hoist and hoist two.
Now to the main electric hoist. electric chain hoist and trolley is composed of motor, coupling, gearbox and drum brake, composed, CO arranged on the machine frame. The lifting height and handling a large quantity of work frequently, good speed performance, can make theempty hook falling fast. The installation or sensitive material, with small velocity.

2014年6月24日星期二

electric wire rope hoist

NRK hyacinth may seem minor, but subdivision is fittings up to more than 30, before we have the main parts cover, chain, hook had made detailed introduction, today's introduces to you the importance of NRK hyacinth sprocket in.
Sprocket appearance is hexagonal, mainly to and cheap wire rope hoist with each other, so we work more smoothly. Such as the lack of a chain wheel or a chain wheel damage,which will happen, chain, chain card stuck phenomenon, will also accelerate the gear wear.
monorail wire rope hoist by hands pulled the zipper, chain wheel rotation, the friction ratchet wheel, brake block pressed into one common rotation, five tooth long axis can be driven by a series of sheet and the wheel to rotate, thereby device in spline hole gear lifting chain wheel drives the electric chain hoist with trolley in order to achieve the balance to lift heavy weights, accessories are indispensable.

2014年6月4日星期三

which also applies to Wire rope hoist

The public has known , industry associations crane provides at least once a year for inspection and maintenance , which also applies to electric hoist. Regular inspection and maintenance helps prevent accidents and avoid loss of time and money caused by parking on . Currently, the plant has a very dense distribution , expertise strong customer service network . And they can sign checks , maintenance contracts , to ensure responsible and specialized inspection schedule to extend electric wire rope hoists the life of the previously mentioned electric hoist , electric hoist as standard lifting gear can be installed on single girder and double girder cranes can also be installed in the suspension hanging on cranes and monorail systems. Electric hoist at the job site using the possibilities are very extensive. In order to enhance the level of transport and parts weighing up to 1600 kg can be used monorail ( 23 ) . In order to cargo belt expand its working area , tend to run track hoist turn into a distant boom , thus constituting a wall or column jib crane line up . To save waiting time , it is best to install two lifting gear in a workplace . When a workpiece is being machined , the workpiece can be processed simultaneously transported and shipped to the new piece. In the process control operations , the use of electric hoist is also very broad. In terms of chemical , textile , paper and electronic processing industry or commodity pool with a solution, such as , electric hoist can work rhythmically . This gives designers have made ??a special request. Electric hoist is one of the most common mass-produced electric lifting machinery .

Wire rope hoist widely used in shipbuilding


 Sales of imported include lever hoist lever hoist , including TOYO lever hoist , lever hoist Victor  Elephant lever hoist ; domestic lever hoist ; chain lever hoist lever hoist including  electric trolleys type ,  lever hoist ,type lever hoist ,  Victoria lever hoist ; wire rope hoist and so on . Here wire rope hoist , lifting Junwei professionals to do a simple description of their common subject headings and maintenance methods for customer reference .

 Hand hoist widely used in shipbuilding , electric power, transportation, construction , mining , telecommunications and other sectors of the equipment installation, lifting items , such as mechanical traction . More kinds of mini electric hoist the main , chain electric hoist, mini electric hoist and explosion-proof electric hoist several models . Chain hoists and hoist are called manual hoist is used to enhance the human heavy , shall be arbitrarily extended operating handle ; operation should let the rest handle freedom follower not jamming . Must choose the appropriate tonnage based on the size of the load hoist . By the motor , transmission and rolls or sprockets , two of wire rope hoist and electric chain hoists .

2014年5月30日星期五

In the gap at the lever hoist a grinding wheel to grind the weld groove

In the gap at the repair with a grinding wheel to grind the weld groove . When filling welding, arc welding best DC reverse polarity . Arc should be as short as possible , electrode diameter 4mm, current is about 210-240a. Welding rod should tend to the direction of motion 20 ° -30 °. Fill welding work from the beginning until the other end of the drill hole cracks , and also on the opposite side welding , the 1.5 ton electric chain hoists weld should not exceed the height of the base plane 1-2mm. When welding environment temperature should be above 0 ℃. As used herein, the Suzhou Industrial Equipment Sen Muda more information, please introduce you to how do electric stacker hydraulic system maintenance in themini electric hoist of electric forklift trucks passing plays pressure , lubrication , cooling and sealing effect, the inappropriate choice of hydraulic oil hydraulic system failure and durability of the early decline. When grade hydraulic oil should randomly select "Manual" specified in special circumstances need to use on behalf of the oil, it should seek the same performance as the original grade performance

2014年5月12日星期一

If the contact is an error Wire rope hoist the test system suspend all testing

If the contact is an error, the test system suspend all testing , and prompts the user to the appropriate  treatment and so on. This will ensure maximum system security and reliability. ( 2 ) Taking into account at  the time of the industrial system fails, the test system can still perform some simple operation , it set  up a "manual" and "automatic " two steps in the test module. ( 3) Before the test , the electric hoist with remote tester needs to be  tested for each wire rope hoist enter a unique code , some of the data corresponding test data and external  testers as the information is stored in the database, when required by this encoding and check out all the  relevant details . Acquisition and state the amount of read access channel 4.3.2 process data in the test  system is wire rope winch accessed through the channel to carry out the process , due to the passage of Chapter IV of the  hardware design process has done a more detailed description , so this summary discusses only the actual  preparation of technical procedures . To achieve the so-called port inspection 4.3.2.1 port scanning is  scanning inspection IPC test program at a certain time interval data acquisition card I / O ports and  digital I / O port to read and write . [ 17 ] [ 21 ] precision generated by cyclic function of time  interval is poor

2014年5月5日星期一

elevating work platforms Wire rope hoist exception occurred during the operation

the platform must be checked before the lifts running , and the ground floor of each protective door is closed place. If all protection
 The door is not closed after the failure to put in place or power reset button, power light does not shine . elevating work platforms
exception occurred during the operation , the emergency stop button should stop running , after exclusion of abnormal
 Press the reset button and the elevator button to resume operation.
elevating work platforms Wire rope hoist must be stopped completely smooth layer of protection to open the door for cargo loading and unloading operations . should pay attention to the cargo loading cargo evenly distributed in the middle of the work surface , prohibiting partial load .Important parts 7 , voltage protection device platform lifting operations , relief , etc. are at the factory according to standards setSet a good , non-professionals are not free to adjust .
noise, and other phenomena shake or tilt the lifting platform operation, should immediately stop inspection and notification

Professionals overhaul.